Eight entry points,
one structure.
Power is the entry ticket — the rest gets built. Each entry point below opens the same verified structure: dedicated project vehicle, clear responsibilities, contracts at market price.
- ENTRY 01
Land
- You bring
- Industrial land with industrial zoning and clean legal status — with a secured grid connection, applied for or already in the connection procedure.
- What follows
- We assess the real power position and the permitting path; the land enters a project vehicle in which it produces rent, recovery of invested capital and a share of the upside.
- ENTRY 02
Building
- You bring
- Existing industrial building — structure, floor, envelope — with clean legal status.
- What follows
- We establish what the asset really offers, on existing documentation; the building becomes a single-tenant powered shell, delivered to the operator ready for fit-out.
- ENTRY 03
Existing grid approval
- You bring
- Technical grid connection approval obtained, filed, or with a position in the connection procedure.
- What follows
- Connection rights, secured through the grid operator's studies; the dedicated substation, developed to the operator's specifications.
- ENTRY 04
Energy producer with available land
- You bring
- Generation capacity or firm supply band, existing or under development, with land available next to the source.
- What follows
- A campus anchored on your energy, contracted by a captive 24/7 consumer, long term — a certainty of demand no spot market can offer.
- ENTRY 05
Available fibre
- You bring
- Two independent fibre routes, quoted by telecom operators, with room to expand.
- What follows
- Connectivity — two routes and two meet-me rooms, designed without a single point of failure — delivered to the operator together with the building and the power.
- ENTRY 06
Capital
- You bring
- Equity or debt capital for conversion, substation and infrastructure works.
- What follows
- Entry into de-risked, documented assets — not speculation on bare land; a repeatable platform, with the first documented site as the entry point.
- ENTRY 07
Capacity demand
- You bring
- Qualified capacity demand — AI training, HPC or cloud — with your own fit-out specification.
- What follows
- A single-tenant powered shell, delivered to your specification — one operator, one contract, one relationship; full technological freedom.
- ENTRY 08
Operations
- You bring
- Data-centre operating capability — facility management, critical-infrastructure teams, certifications.
- What follows
- Long-term operating mandates on the platform's sites; a portfolio of comparable facilities, operated to a single standard.
A platform that can be audited,
not a promise.
Every entry point passes through the same five gates. We publish the method because our partners — operators and investors — fund evidence, not renderings.
- GATE 01
Sourcing
Power first: land or industrial buildings with a secured connection, applied for or already in the connection procedure, industrial zoning, expansion reserve.
EVIDENCE · grid connection file, land register - GATE 02
Assessment
We establish what the asset really offers — power, structure, permitting path — on existing documentation, with verifications only where the stage of discussions justifies them.
EVIDENCE · technical documentation, targeted verifications - GATE 03
Power
Connection rights, secured through the grid operator's studies; the dedicated substation, developed to the operator's specifications.
EVIDENCE · grid operator studies and approvals - GATE 04
Permitting
Planning classification is verified first; where the conversion requires it, the zonal urban plan is prepared in parallel with the grid connection — from the urban planning certificate to the building permit.
EVIDENCE · certificates issued, permitting file - GATE 05
Delivery
Single-tenant powered shell: the building, the power and the fibre from us — the IT fit-out, specified and funded by the operator.
EVIDENCE · handover protocol, power guarantees
Sourcing, assessment and the entire Romanian permitting cycle — urban planning, environment, energy — are handled in-house.